TR
Sale Completed

Tem 34 Esenyurt
Phase 1 and 2

Elevator access to every floor, a strong energy infrastructure, and high load capacity support uninterrupted production and logistics processes.

Project Construction Area 212,961m²
Commercial Units 166
Project Delivery Date Esenyurt 1 2017 - Esenyurt 2 2020
Location

A Center That Takes Its Power from Its Infrastructure for Industry and Logistics Operations

TEM 34 Esenyurt Phase 1 and 2, is one of the strong examples of the "34 Projects" concept developed by Akyapı in 2013, focused on industry and warehousing. Located in a strategic position in Esenyurt, the project offers an infrastructure that provides operational advantages to companies in an area with intensive production and logistics activities. The development that started with TEM 34 Esenyurt 1 has grown with the second phase, which was launched due to high interest, reaching a total of approximately 200,000 m² of covered area and becoming a comprehensive industrial center.

The project offers independent unit options ranging from 400 m² to 25,000 m², creating flexible usage opportunities that meet the needs of businesses operating at different scales. Floor heights ranging from 7 to 10 meters, column spans of 9–10 meters, and wide corridor structures enable efficient execution of production, storage, and logistics processes. Industrial doors in each independent unit and planning suitable for truck maneuvering support uninterrupted on-site operations.

Each floor has independent truck entry, a heavy load carrying capacity, and a 180 kVa energy infrastructure for 1000 m² area, providing a strong technical infrastructure for sectors requiring high production capacity. Truck maneuver ramps and spacious operational areas increase the speed and safety of logistics processes, while the project's location offers easy access to industrial and transportation axes.

TEM 34 Esenyurt Phase 1 and 2, with its infrastructure supporting all processes from production to storage, creates a comprehensive operational environment for industrial and logistics companies.

Frequently Asked Questions
TEM 34 Esenyurt project has been developed within which concept?

The project has been realized within the scope of the "34 Projects" concept developed by Akyapı for industrial and logistics needs.

What advantages does the technical infrastructure in the project offer to businesses?

Each floor has truck access, high energy capacity, and heavy load-bearing infrastructure to support uninterrupted production and storage processes.

Which needs do the independent unit options address?

Area options ranging from 400 m² to 25,000 m² offer flexible usage opportunities for industrial and logistics companies operating at different scales.

Contact Form
×
444 25 14 Monday-Saturday 9:00AM - 6:00PM
  • They usually respond within 1 hour.
Contact Us
Phone me
Whatsapp
Phone me
Brochure